HackerTrans
TopNewTrendsCommentsPastAskShowJobs

phongn

no profile record

comments

phongn
·5 bulan yang lalu·discuss
Tevatron’s construction program built up a lot of industrial capacity for superconducting magnets. This was by design, in the hopes that it would drive induced demand for them. One of the first beneficiaries were MRI machines, which became a lot more affordable to produce.

The DOE hoped to repeat that success in the 1990s with the much larger SSC, but it was cancelled.
phongn
·5 bulan yang lalu·discuss
ISABELLE, which was a cancelled proton-proton collider. Major delays with its magnet design meant that it was overtaken by existing programs at CERN and Fermilab. RHIC reused its hall.
phongn
·8 bulan yang lalu·discuss
I grew up with *.pinellas.k12.fl.us and that domain remains seared into my memory.
phongn
·9 bulan yang lalu·discuss
You want one of the latest ones rated for 100m (1.8W peak); the older 80m (2.5W) ones run hotter and the 30m ones are really hot.