Why does a carpenter cut the end off a 10-foot board to get a required 9ft-2in, thereby wasting 8% of the input and incurring dumpster charges? Suppose the architect's design specified the cutlist, to be transmitted to the board "factory", which would cut boards to the required lengths, tagging them with RFID serial numbers indexed to the design, stacking them so the first ones to be used are on the top, and truck to the site without passing through Home Depot?