ASF rules require a report from the PMC at every third month. There reports are written by the Project Membership Committee, and checked by the Board. (I know that they really read them).
Board reports (including project reports) are open (with 1-2 month delay, they are published only after approval, at the next Board Meeting).
https://www.youtube.com/watch?v=k58WnbKmjdA