HackerTrans
TopNewTrendsCommentsPastAskShowJobs

Ringz

no profile record

Submissions

Peter Vogel's Fairlight Audio Archives

anerd.com
1 points·by Ringz·قبل شهرين·1 comments

Peter Vogel's personal Fairlight picture gallery

anerd.com
2 points·by Ringz·قبل شهرين·0 comments

Peter Vogel's Limestone House

anerd.com
1 points·by Ringz·قبل شهرين·0 comments

Someone Is Using AI to Exploit Lonely Writers on Substack

modernshakers.substack.com
2 points·by Ringz·قبل 5 أشهر·0 comments

Uncut Reviews: Kraftwerk – Reissues

uncut.co.uk
3 points·by Ringz·قبل 6 أشهر·1 comments

comments

Ringz
·قبل 16 يومًا·discuss
Why not London/UK?
Ringz
·الشهر الماضي·discuss
Whats the difference between LS and LuLu. I have an old LS license and after I switched to LuLu I didn’t miss anything.
Ringz
·الشهر الماضي·discuss
https://archive.is/KxRaw
Ringz
·قبل شهرين·discuss
I once took a didgeridoo course and played for quite a while after that. One weekend of 2×3 hours of didgeridoo playing, and my nose was incredibly clear. Like never before and never again since.

By the way, you can practice circular breathing very well in the shower. Take water in your mouth and breathe in through your nose while simultaneously spraying the water out through your lips.
Ringz
·قبل شهرين·discuss
Ente Auth

is a good alter. Works perfect for me.
Ringz
·قبل شهرين·discuss
That’s exactly how I think, too. But at the same time, I like indentation in Python, because I would logically indent in every other language as well. In fact, I find all those semicolons and similar things at the end of each line completely redundant (why should I repeat myself for something the compiler should do) and I hate them. And that’s despite having experience with Modula and 10 years of C++. But when I look at Rust, I find the syntax simply awful. From an ADHD perspective…
Ringz
·قبل شهرين·discuss
Good catch! Thanks for that study!
Ringz
·قبل شهرين·discuss
Uranium mines will become a problem if every country tries to make 25% of electricity with nuclear. Electrification of primary energy might even need more nuclear according to some pro nuclear people.

Many forget that while there is plenty of uranium on Earth, most of it occurs in very low concentrations. The lower the concentration, the higher the CO₂ emissions for the entire uranium chain from the mine to the fuel rod.

Meanwhile, renewable energies receive free fuel from the sun. They are already recyclable today and, with intelligent local and intercontinental grids, will also require fewer batteries for storage.
Ringz
·قبل شهرين·discuss
Again. Show us some peer reviewed studies for your claims. A simple search will show you that, according to dozens or hundreds of peer reviewed studies, research and real world examples, a 100% renewable energy solution is feasible.
Ringz
·قبل شهرين·discuss
The alternative is only renewables. And we don’t have to stop all industries for it.

Show us some evidence based and peer reviewed studies for your claims. Repeating the same old and scientifically unproved claims doesn’t help.
Ringz
·قبل شهرين·discuss
And don’t forget they will get more expensive over time.
Ringz
·قبل شهرين·discuss
They are not on track.

From https://www.worldnuclearreport.org/World-Nuclear-Industry-St...

> According to the China Nuclear Energy Association, despite higher output, nuclear’s share of China’s total electricity production slightly slipped from 4.9 percent in 2023 to 4.7 percent in 2024, (Energy Institute data indicate a 3.7-percent increase in net production and a drop from 4.7 percent to 4.5 percent of the nuclear share).40 The remarkable share decline occurred because China’s electricity consumption grew by 6.8 percent or 627 TWh—significantly larger than Germany’s total annual demand—to a total of over 9,850 TWh, and the country added a combined 357 GW of solar and wind capacity (278 GW and 79 GW, respectively) in the same year compared to just 3.5 GW of new nuclear.41

And from https://www.worldnuclearreport.org/World-Nuclear-Industry-St...

> Targets vs. Reality

> China has dominated global nuclear power development over the past quarter-century, though its ambitious latest Five-Year Plan targets have proven challenging to meet. The 10th Five-Year Plan (2001–2005) put forward a policy of “moderate development of nuclear power,” targeting around 8.6 GW gross operating capacity by 2005,61 with 7.1 GW gross achieved in reality. (All Five-Year Plan capacity numbers quoted hereunder are gross gigawatts). During this period, China connected six new units to the grid—including two French 900-MW reactors at Ling Ao and two Canadian 668-MW CANDU 6 reactors at Qinshan—and completed the development of the CPR-1000, China’s indigenized version of the French M310 900-MW design that would become the workhorse of its early nuclear fleet. The 11th Five-Year Plan (2006–2010) called on China to pursue “an active development of nuclear power” with a target of 10 GW gross operating by 2010.62 With 10.9 GW gross operating at the end of 2010, that target was slightly over-achieved. This period saw the construction starts for Westinghouse’s two AP-1000s at Sanmen in 2009 and AREVA’s EPRs at Taishan in 2009–2010, China’s first Gen III projects. Construction commenced on 29 units, most of which were CPR-1000 reactors. Fukushima’s March 2011 disaster fundamentally reshaped China’s nuclear trajectory during the 12th Five-Year Plan (2011–2015). The government imposed a moratorium on new approvals to conduct comprehensive safety reviews. Existing plants and Gen II reactors under construction had to undergo major upgrades including enhanced flood barriers, backup power system overhauls, and seismic reinforcements.63 When approvals resumed, China adopted a strict “Gen III-only” policy requiring passive safety features and core-catchers. Operational capacity reached just 28.7 GW by 2015 versus a target of 40 GW.64 Nevertheless, the period closed with construction beginning on Fuqing-5 and -6 as well as Fangchenggang-3, China’s first Hualong One reactors, representing its indigenous Gen III technology. The 13th Five-Year Plan (2016–2020) aimed for 58 GW operational capacity plus 30 GW under construction while establishing the Hualong One as an exportable technology and advancing systems like the high-temperature gas-cooled reactor (HTR-PM) and fast reactors.65 However, domestic capacity reached only 51 GW by 2020 and 17.5 GW under construction constrained by the ongoing inland reactor ban— a controversy unheard of in other nuclear countries limiting nuclear power plant development to the seashore—and extended construction timelines for Generation III units. In August 2019, the U.S. added CGN to its Entity List,66 citing national security concerns regarding alleged attempts to acquire U.S. technology for military purposes.67 This restricted CGN’s access to certain technologies and affected its international partnerships, including involvement in nuclear projects in the United Kingdom. Later, CNNC was also added to the Entity List.68 The sanctions reinforced China’s focus on self-reliance, accelerating the transition from foreign technologies to the domestically developed Hualong One design. With an operating capacity of around 61 GW as of mid-2025, the 14th Five-Year Plan (2021–2025)69 target of 70 GW operational capacity is out of reach. According to plans, 4.5 GW are scheduled to come online in 2025, but no new reactor started up in the first half of the year. COVID-19 pandemic disruptions to global supply chains, combined with delays caused by mandatory safety upgrades, have created persistent bottlenecks. First-of-a-kind Hualong One projects saw numerous delays (see Figure 23). Meanwhile, plans for innovative projects like offshore floating nuclear power platforms appear to have stalled, with 2023 reports suggesting the program may have been suspended over safety and feasibility concerns.70
Ringz
·قبل شهرين·discuss
Looking at *all* my external drives now... that would be great.
Ringz
·قبل شهرين·discuss
I usually try to explain it like this: “Single writer” is rarely a real problem, because a writer is not slow. It writes exclusively, but very quickly.

"Batch writer pattern" is a good idea to get rid of expensive commits.
Ringz
·قبل شهرين·discuss
still not avalable in germany
Ringz
·قبل شهرين·discuss
Around 40000 and a real name with 4 digits. Thought I was late.
Ringz
·قبل شهرين·discuss
Is it available only in the US? Right now it’s not available in Germany. Maybe it (AppStore)takes time?
Ringz
·قبل شهرين·discuss
Here is a collection of audio material including Fairlight demos, radio interviews and CMI pieces from the eighties. There are even a couple of recordings from the Fairlight CMI's predecessor, the Qasar M8, designed by Tony Furse. The M8 did not use sampling, the sounds were generated by additive Fourier synthesis.
Ringz
·قبل 3 أشهر·discuss
Extremely interesting and also humorously written. Considering that Firefox once changed its plugin system to become more secure, you can still cause quite a lot of damage with plugins. By now I get by with very few plugins. I think everyone should try to use as few as possible.

I have the feeling there are even more plugins for Chrome, right? That would certainly be worth exploring too.
Ringz
·قبل 3 أشهر·discuss
No. In Germany, rooftop solar is usually economically attractive, not prohibitively expensive. Especially on a decent roof and if you use a fair share of the power yourself. Verbraucherzentrale(1) says PV systems for private homes are “usually worthwhile” economically, and that self-consumption is the key driver of profitability.

(1) https://www.verbraucherzentrale.de/wissen/energie/erneuerbar...